// SC26 BADGE PROGRAM //SIGNAL INTELLIGENCE// HANDLE VIA SAINTNET CHANNELS ONLY //
Unauthorized downlink detected
Intercepted Transmissions
Somebody inside the badge fabrication bay is transmitting on an open
channel. Mission control denies everything. We decrypt what we catch
and post it here, one intercept at a time, until the SC26 badge
lifts off with everyone at the conference.
Reminder: your badge is your boarding pass.
INTERCEPT 007 // DOCK LINK
SOURCE
BADGE FABRICATION BAY
FORMAT
MOTION CAPTURE WITH AUDIO
STATUS
SIGNAL LOCKED
RECOVERED FROM DOWNLINK
No transmissions came from the fab bay channel after the station
plans. At 12:05 AM we received a short burst. It is the first
intercept with motion, and it has audio.
Turn your sound on. Whatever they are building is made to connect
to something.
MOTIONRECOVERED
AUDIORECOVERED
DESTINATION[REDACTED]
HANDSHAKECOMPLETE
SAINTCON 2026Dock link established
INTERCEPT 006 // STATION PLANS
SOURCE
STARREACH ENGINEERING DIVISION
FORMAT
DRAWING HS-001-001, REV C
STATUS
FULL SHEET
ENCRYPTED PAYLOAD
Sheet 1 of 1. Drawn at 1:500. Zoom in; the tables are legible.
RECOVERED FROM DOWNLINK
A full drawing sheet this time, not a photograph. Horizon Station,
three habitation rings on arms off a central hub, 482.6 metres tip
to tip. The hub handles docking, transit, life support and power
distribution. Initial crew capacity is listed at 240 and marked
expandable.
The legend names a fusion reactor as primary power with solar
arrays as auxiliary, four docking ports and four cargo bays.
Twelve numbered callouts cover the habitation module, research
labs, hydroponics, life support, cargo, communications, radiators,
maintenance access and a transit shaft. A twelfth is an expansion
module, marked provisional.
The delivery schedule is the part worth reading. Habitation is
down for Q3 2026 and research for Q4, both scheduled. Agriculture,
industrial and observation modules are planned across 2027. The
final module configuration is stamped PENDING REVIEW, so somebody
has not signed off on what this ends up being.
DRAWINGHS-001-001 REV C
APPROVEDFOR CONSTRUCTION 07.14.26
CONFIGURATIONPENDING REVIEW
DECRYPTIONSUCCESSFUL
INTERCEPT 005 // CARGO CALL
SOURCE
STARREACH BROADCAST RELAY
FORMAT
TEXT BULLETIN
STATUS
CLEAN COPY
RECOVERED FROM DOWNLINK
Not a leak this time. This one went out on an open relay, addressed
to anyone with a ship and a reason to fly it. No image, no
attachment, no encryption worth the name. Just the text below,
repeating on the carrier.
TEXT PAYLOADRECOVERED
ENCRYPTIONNONE DETECTED
ROUTE[REDACTED]
DEPARTURE WINDOW[REDACTED]
STARREACH INITIATIVE BULLETIN #12
CARGO PILOTS WANTED FOR ORION TRAIL
Humanity's frontier is expanding faster than our supply lines can keep pace.
StarReach is seeking capable pilots to transport critical materials from distant settlements back to the station. Construction crews are standing by, and every shipment helps build the future.
Prospective pilots are advised to prepare their vessels before departure. A larger fuel reserve can open new opportunities. A stronger hull can help when opportunity opens back.
Frontier travel is rarely predictable. Equipment failures, unusual discoveries, and difficult decisions are all considered normal operating conditions.
Successful captains know that a capable crew can make the difference between a profitable expedition and an interesting accident.
Outposts farther from the station often offer better opportunities, but frontier markets change quickly. The best deals rarely wait for long.
Remember: the measure of a pilot is not how far they travel, but what they bring home.
The stars are waiting.
INTERCEPT 004 // IMAGE SET
SOURCE
BADGE FABRICATION BAY
FORMAT
IMAGE SET
STATUS
PARTIAL DECODE
RECOVERED FROM DOWNLINK
We caught a long transmission off the fab bay channel. Twelve
images came through. The rest of the packet did not decode.
IMAGES12 RECOVERED
REMAINDERNOT DECODED
PORTA
FIBULA
SERA
DAEMON
ECHO
LIMES
IGNIS
ECHO
CLAVIS
SERA
UMBRA
LIMES
INTERCEPT 003 // FLIGHT WING
SOURCE
BADGE FABRICATION BAY
FORMAT
ENAMEL PROOF, CRT DOWNLINK
STATUS
SIGNAL WEAK
TRANSMISSION //
INTERRUPTED
ORIGIN:
ORION TRAIL
SIGNAL:
WEAK
CH 03 ▶
DATA LOSS
47%
STATUS:
AUTOLINK FAILED
ATTEMPTING REBUILD
...
BUILD
CONNECT
EXPLORE
ENCRYPTED PAYLOAD
Signal recovered at partial fidelity. Colors are not final badge colors.
RECOVERED FROM DOWNLINK
A third frame off the fabrication-bay channel, and this one fought
us the whole way down. The carrier kept dropping. What came through
is a badge proof, wings and a rocket climbing past a ringed planet,
pulled off a failing monitor somewhere in the bay.
Nearly half the packet was lost and the rest arrived scan-lined and
torn. We rebuilt what we could. Look as closely as the static lets you.
IMAGE PAYLOADRECOVERED (DEGRADED)
DATA LOSS47%
CARRIERWEAK / INTERMITTENT
DECRYPTIONBEST EFFORT
INTERCEPT 002 // FLIGHT COMPUTER
SOURCE
BADGE FABRICATION BAY
FORMAT
PCB FAB PLOT, CLOSE FIELD
STATUS
IMAGE ONLY
ENCRYPTED PAYLOAD
Drafting plot. Colors are not final badge colors.
RECOVERED FROM DOWNLINK
Another frame off the same open channel. One component,
photographed close, dead center of the board. No callouts, no
commentary, no attached document this time.
Whoever is leaking from the fabrication bay sent the picture and
went dark again. Look as closely at the board as you like.
IMAGE PAYLOADRECOVERED
ATTACHMENTNONE TRANSMITTED
DECRYPTIONSUCCESSFUL
INTERCEPT 001 // RAW CAPTURE
SOURCE
BADGE FABRICATION BAY
FORMAT
PCB FAB PLOT, CLOSE FIELD
STATUS
PARTIAL DECRYPT
ENCRYPTED PAYLOAD
Drafting plot. Colors are not final badge colors.
RECOVERED FROM DOWNLINK
One image, transmitted clean. No annotation, no commentary, no
explanation. Whoever is leaking from the fabrication bay sent
the picture and went dark.
The attached document finally cleared cryptanalysis. Alongside the
image, socket footprints, pin numbering, dimension callouts, there
is now plain text. Open the bulletin, or look as closely at the
board as you like.
IMAGE PAYLOADRECOVERED
ATTACHMENT
DECRYPTIONSUCCESSFUL
FULL-BOARD SCAN[REDACTED]
CARRIER RESIDUEsc26-secret-cl-material-pad-7a3f
Building a minibadge this year? The open
minibadge standard
is unchanged, and the minibadge primer
covers the rest. Build to spec. Exactly to spec.
> technical_bulletin_7.txt
On previous missions, badge intel surfaced through the Badge Life
community. This year somebody is beaming it straight off the fab
floor, so keep watching this page. Announcements hit
Discord first, or
Join the Briefing and we will flag
the next downlink for you.